2012
82 projects
- 2012 RIS for HCM (Sarawak) Engineering Sdn Bhd Year 2012 Sarawak 10
- 2012 RIS For Roadcare Sdn Bhd (April 2012) April 2012 28
- 2012 RIS For Roadcare Sdn Bhd (August 2012) August 2012 32
- 2012 RIS For Roadcare Sdn Bhd (December 2012) December 2012 25
- 2012 RIS for Roadcare Sdn Bhd (February 2012) February 2012 32
- 2012 RIS For Roadcare Sdn Bhd (January 2012) January 2012 34
- 2012 RIS For Roadcare Sdn Bhd (July 2012) July 2012 32
- 2012 RIS For Roadcare Sdn Bhd (June 2012) June 2012 27
- 2012 RIS for Roadcare Sdn Bhd (March 2012) March 2012 31
- 2012 RIS For Roadcare Sdn Bhd (May 2012) May 2012 29
- 2012 RIS For Roadcare Sdn Bhd (November 2012) November 2012 29
- 2012 RIS For Roadcare Sdn Bhd (October 2012) October 2012 26
- 2012 RIS For Roadcare Sdn Bhd (September 2012) September 2012 26
- 2012 Pavement Condition Assessment along SPRINT Highway for Year 2012 11
- 2012 PCA along LDP for Year 2012 (IRS Only) IRS Only 6
- 2012 PCA along Shapadu Highway for Year 2012 11
- 2012 PCA along SPRINT for Year 2012 (IRS Only) IRS Only 6
- 2012 PCA at Shapadu Highway 18
- 2012 PCA at SILK Highway 11
- 2012 PCA for Selected Putrajaya Protocol Roads Year 2011 17
- 2012 Proposed Pavement Condition Assessment Within Penang Bridge Concession Area For Year 2011 (Cons 4
- 2012 Proposed Pavement Condition Assessment Within Penang Bridge Concession Area For Year 2011 (Skid 9
- 2012 Proposed Pavement Condition Assessment Within Penang Bridge Concession Area For Year 2011 (Team 3
- 2013 PCA For Lebuhraya Kajang SILK Year 2012 29
- 2012 IRI Along EDL, Johor Bahru (Jul 2012) Jul 2012 12
- 2012 IRI Along EDL, Johor Bahru(Feb 2012) Feb 2012 7
- 2012 IRI at FT003, Daerah Marang, Terengganu 10
- 2012 IRI Measurement at FT1, Jalan Rawang - Kuala Kubu, Selangor 10
- 2012 IRI Measurement at FT2, Jalan Bentong - Kuantan, Pahang 10
- 2012 IRI Measurement at FT29, Jalan Putrajaya - LDP border 10
- 2012 IRI Measurement at LPT 2, Package 11, K. Terengganu 10
- 2012 IRI Measurement at LPT 2, Package 1B, Jabor, Kemaman, Terengganu 12
- 2012 IRI Measurement at LPT 2, Package 5a, Kemaman, Terengganu 13
- 2012 IRI Measurement at LPT 2, Package 6, Kemaman 11
- 2012 IRI Measurement at LPT 2, Package 9c, K. Terengganu 11
- 2012 IRI Measurement at Projek Menaiktaraf Jalan Titi Ayun, Yan , Kedah 10
- 2012 IRI Measurement at SKVE 12
- 2012 IRI Measurement for Projek Membina Jalan Persisir Pantai dari Kuala Sanglang ke Kuala Kedah (Pk 10
- 2012 IRI Test for Membina dan Menaiktaraf Jalan Lingkaran Pulau Indah, Negeri Selagor Darul Ehsan 11
- 2012 Projek Manaiktaraf IRI di Lokasi Strategik KPI Menteri Kerja Raya Tahun 2012 - FT14, Jalan Jera 10
- 2012 IRS and FWD Tests at FT10, Jalan Bera - Temerloh, Pahang 13
- 2012 Menjalankan Ujikaji Pavemen Menggunakan FWD & Axle Load di Kawasan UiTM, Shah Alam 10
- 2012 PSO 2011: FWD Test at Section S2, S4, N2, N3 & N4 of North South Expressway 11
- 2012 Ujian Pavemen Menggunakan FWD di Kawasan UITM, Shah Alam, Selangor 10
- 2012 GPR at Bangunan R&D (styling) Produa, Sg. Choh, Serendah, Hulu Selangor styling 4
- 2012 GPR at Dewan Bahasa & Pustaka, KL 4
- 2012 GPR at MINDEF, Kuala Lumpur 5
- 2012 GPR Survey at Bayan Lepas (phase 1), Penang phase 1 5
- 2012 GPR Survey at Bayan Lepas (Phase 2), Penang Phase 2 7
- 2012 GPR Survey at MAEPS, Serdang 4
- 2012 GPR Survey at Medan Mara 5
- 2012 GPR Survey at the slope area of the tower TNB 105, Temenggor - Pergau, Gerik, Perak 5
- 2012 GPR Survey at Unipark Suria 5
- 2012 GPR Survey for Projek Menaiktaraf Hospital KL 7
- 2012 Utilities Detection using GPR at Sg. Buloh 8
- 2012 Cadangan Menaiktaraf (Laluan B28) Jalan Greenwood, Mukim Setapak, Daerah Gombak, Negeri Selango Laluan B28 15
- 2012 FDR Research - Field Test for Post Construction 24 months at CIPR Research at FT2686, Felda Mak 11
- 2012 Field tes for Pre-construction of HIPR Research FT03 Sec 692 - 694, Jln Pasir Puteh, Kota Bharu 17
- 2012 Field Testing for Post Construction 48 Months of CIPR Research Section at FT1574 (Felda Krau) P Felda Krau 11
- 2012 IRS at EDL Highway 10
- 2012 IRS at Jalan Kg Durian Telor, Terengganu 10
- 2012 IRS at Jalan Sg Lokan ke Permatang Tok Bidan, Seberang Perai Utara, Penang 10
- 2012 IRS at Jalan Susur Permatang Buloh ke Pajak Song, Seberang Perai Utara, Penan 10
- 2012 IRS at PLUS Highway, Section N2 (Km90.00 - Km97.76) Km90.00 - Km97.76 10
- 2012 Pavement Evaluation at FT14, Sec 55 & 89, Jalan Jerangau - Jabor, Terengganu 12
- 2012 Pavement Evaluation at FT1579 Section 5 - 6, Jalan Palong 16 - Tembangau, Bera, Pahang 13
- 2012 Pavement Evaluation at FT247, Jalan Sg. Tong - Ajil, Terengganu 14
- 2012 Pavement Evaluation at Jalan Bakun, Bintulu, Sarawak 10
- 2012 Pavement Evaluation at Jalan Johor Bahru - Pasir Gudang (FT17) Dari 4 Lorong ke 6 Lorong FT17 16
- 2012 Pavement Rehabilitation Works at Various in Guthrie Corridor Expressway For Prolintas Expresswa 11
- 2012 Pavement Testing at FT03, Kemaman, Terengganu 14
- 2012 Proposal 3
- 2012 Reimburseable (TE)For Roadcare Sdn Bhd TE 9
- 2012 Reimburseable Overtime(TI)For Roadcare Sdn Bhd TI 9
- 2012 Rental of Vehicle 1