2014 Pavement Evaluation at EDL Highway, Johor Bahru
2014 Other
18
Docs
2.3 MB
Size
5
People
Project Lifecycle
Commercial 2
Planning 2
Pre-Mob 3
Field Work 4
Data Processing 5
Billing 1
Other 1
All Documents
| # | Doc No | Title | Display Name | Phase | Uploaded By | Date | Size |
|---|---|---|---|---|---|---|---|
| 1 | QUOTATION | Quotation | Quotation_EDL.pdf | commercial | smt | 15/07/2014 | 55.4 KB |
| 2 | LA | Letter of Award | LA_EDL.pdf | commercial | smt | 15/07/2014 | 68.6 KB |
| 3 | IPAVES-F06 | Work Instruction Form | IP-F06_Pavement Evaluation at EDL Highway.pdf | planning | Vincent | 14/07/2014 | 154.1 KB |
| 4 | IPAVES-F07 | Resources Allocation Checklist | IP-F07 Resources Allocation (2014).pdf | planning | smt | 17/07/2014 | 88.0 KB |
| 5 | ITP-F17 | Axle Load Survey (PreMobilisation) | ITP-F17-EDL.pdf | premob | smt | 12/08/2014 | 195.1 KB |
| 6 | ITP-F04 | HAWKEYE 2000 (PreMobilisation) | F4_HAWKEYE_Pre Mob_E14 EDL Highway (MRCB).pdf | premob | johan | 18/07/2014 | 77.0 KB |
| 7 | ITP-F07 | FWD / HWD (PreMobilisation) | ITP-F7-EDL.pdf | premob | smt | 12/08/2014 | 137.9 KB |
| 8 | ITP-F09 | FWD / HWD Daily Progress Record | ITP-F9-EDL.pdf | field work | smt | 12/08/2014 | 132.8 KB |
| 9 | ITP-F05 | HAWKEYE 2000 (Operation) | F5_HAWKEYE_Operation_E14 EDL Highway (MRCB).pdf | field work | johan | 18/07/2014 | 43.8 KB |
| 10 | ITP-F06 | HAWKEYE 2000 Daily Progress Record | F6_HAWKEYE_Progress_E14 EDL Highway (MRCB).pdf | field work | johan | 18/07/2014 | 42.2 KB |
| 11 | ITP-F08 | FWD / HWD (Operation) | ITP-F8-EDL.pdf | field work | smt | 12/08/2014 | 134.1 KB |
| 12 | RPT | Report | Results.pdf | data processing | Vincent | 29/08/2014 | 689.0 KB |
| 13 | ITP-F33 | Data Processing & Validation Checklist | F33_EDL Highway (E14).pdf | data processing | anie | 13/08/2014 | 125.5 KB |
| 14 | ITP-F34 | Report Preparation Checklist | F34_EDL Highway (E14).pdf | data processing | anie | 24/07/2014 | 97.7 KB |
| 15 | ITP-F35 | Data Hand Over Checklist | ITP-F35_EDL_FWD_AL.pdf | data processing | smt | 12/08/2014 | 53.1 KB |
| 16 | ITP-F35 | Data Hand Over Checklist | F35_Data Hand Over Checklist_Rev 1_E14 EDL Highway (MRCB).pdf | data processing | johan | 18/07/2014 | 46.0 KB |
| 17 | INV | Invoice | PAV_14_P080.pdf | billing | as | 29/08/2014 | 110.4 KB |
| 18 | QP-18 | Credit Control and Debts Collection / Recovery Procedure | ITP-F18-EDL.pdf | other | smt | 12/08/2014 | 139.0 KB |