2023 (LGM) PAVEMENT CONDITION ASSESSMENT (PCA) SECARA CERAPAN DATA MENGGUNAKAN NETWORK SURVEY VEHICL

2023 PCA LGM

16

Docs

9.8 MB

Size

5

People

Project Lifecycle

All Documents

(16)
#Doc NoTitleDisplay NamePhaseUploaded ByDateSize
1QUOTATIONQuotationQuotation - LGM - Final.pdfcommercialsyahrul12/05/20233.1 MB
2LALetter of AwardLA - SST LEMBAGA GETAH MALAYSIA 2023.pdfcommercialsyahrul06/07/20231.1 MB
3IPAVES-F06Work Instruction FormIP-F06 LGM.pdfplanningsyahrul06/07/2023323.7 KB
4IPAVES-F07Resources Allocation ChecklistIP-F07 LGM.pdfplanningsyahrul06/07/2023317.5 KB
5ITP-F04HAWKEYE 2000 (PreMobilisation)ITP-F4_HAWKEYE PRE-MOBILISATION.pdfpremobzarrin15/08/2023172.7 KB
6ITP-F01ACD (PreMobilisation)ITP-F1_ACD PRE-MOBILISATION.pdfpremobJohan11/08/2023558.2 KB
7ITP-F03ACD Daily Progress RecordITP-F3_Rev0_ACD IRS LEMBAGA GETAH.pdffield workJohan11/08/20232.2 MB
8ITP-F05HAWKEYE 2000 (Operation)ITP-F5_HAWKEYE OPERATION.pdffield workzarrin15/08/2023145.7 KB
9ITP-F06HAWKEYE 2000 Daily Progress RecordITP-F6_HAWKEYE PROGRES.pdffield workzarrin15/08/2023379.2 KB
10ITP-F02ACD (Operation)ITP-F2_ACD OPERATION.pdffield workJohan11/08/2023351.6 KB
11ITP-F35Data Hand Over ChecklistITP-F35_DATA HAND OVER I2R1.pdfdata processingzarrin15/08/2023129.8 KB
12ITP-F35Data Hand Over ChecklistITP-F35_DATA HAND OVER I2R11.pdfdata processingJohan11/08/2023489.9 KB
13ITP-F33Data Processing & Validation ChecklistITP-F33_PCA_LGM.pdfdata processingShaiful30/08/202373.7 KB
14ITP-F34Report Preparation ChecklistITP-F34_PCA_LGM.pdfdata processingShaiful30/08/202382.1 KB
15INVInvoicePAV_23_P080 (LGM).pdfbillingasma01/09/2023259.3 KB
16INVInvoicePAV_23_P081 (LGM).pdfbillingasma01/09/2023258.7 KB

iPaves Document Archive — 14,777 documents across 16 years (2011–2026)

Data source: pav-isodocs.ipaves.my